
HERB BOOTH: UT ARLINGTON MEDIA RELATIONS –
Some highways, however, experience slope failures deeper below the surface than the pins can reach. To repair these, Hossain is implementing a new technique where crews remove the soil about halfway to the location of the failure, insert rows of pins, then cover the area and insert more rows of pins to provide stabilization all the way to the surface.